YOUR ENERGY MULTIPLIED OVER YEARS

YEMOY brings TLPPC technology into datacenters and energy networks

  • ÷2Processed power divided by 2
  • 99.5%Outstanding efficiency
  • 0.5%Minimal heating
  • 800 / 48 VDC2 product ranges

General principle

The TLPPC principle: YEMOY converters process only half of the power for the same service => a factor of 2 gained on every key criterion

Best of the state of the art

DC Storage → Bus
≤99% efficiencyHeat lost: ≥10kW

YEMOY

DC Storage → Bus
≥99.5% efficiencyHeat lost: ≤5kW(divided by at least 2)
See the solution

Challenge → TLPPC solution

ChallengeTLPPC solution
ConsumptionProcessed power divided by 2
HeatingLess energy → less heating
FootprintFewer components → less volume
Production costFewer components → lower cost
ReliabilityFewer components + less heating → fewer failures
See the solution

Competitive advantage

Comparison of conversion technologies

Comparison of conversion technologiesConventionalPartial PowerYEMOY
Processed power100%50%50%
TransformerNoYesNo
ComplexityLowHighLow
CostLowHighMinimal
CoolingHighLowMinimal
See the solution

Performance at 800V 120kW

>99.5%

Excellent efficiency over the whole range

See the solution
Efficiency @+/-120kW vs battery voltage
  • Discharge
  • Charge
99.5%99.6%99.7%450V550V650V750VDischargeCharge
View the data
SeriesVEfficiency
Discharge520 V99.69 %
Discharge600 V99.63 %
Discharge680 V99.61 %
Discharge760 V99.67 %
Charge760 V99.59 %
Charge680 V99.55 %
Charge600 V99.53 %
Charge520 V99.54 %
Charge440 V99.57 %

Performance at 48V 5.5kW

>99%

Efficiency maintained over the whole range

See the solution
Comparison of YEMOY technology efficiency vs competition

TLPPC in datacenters: BBU & CBU

BBU: Battery Backup Unit, for backup batteries.
CBU: Capacitor Backup Unit, to smooth GPU power demand.

Side-car → HV Bus → Compute rackSource: Infineon
See the solution

Why CBUs

The power drawn from the grid is constant: the flow leaving it keeps the same size in both phases.

High consumption: part comes from the grid, part from the supercapacitors.Consumption drops: the grid recharges the supercapacitors through the CBU.
Power gridDatacenter(compute phase)(storage phase)CBUCapacitor Backup UnitCapacitor Backup UnitSupercapacitorsConstant powerVariable powerPower gridDatacenter(compute phase)(storage phase)CBUCapacitor Backup UnitCapacitor Backup UnitSupercapacitorsConstant powerVariable power
See the solution